Saturday, September 17, 2005

Day 5 - Ceiling is up




The ceiling has been framed in and is now installed. It is 4.5 inches higher than before, for some reason, when this place was originally constructed the builder had the bathroom ceilings much lower than needed for electrical runs.

The walls are nearly complete and the tub is sitting where it will be installed.

No comments: